Our Projects

Building self-sufficiency,
one project at a time.

Every project follows our 4-pillar model: Water → Food → Livelihoods → Education. Every budget is public. Every setback is documented.

Lolo Aquaculture Project

Lolo Refugee Camp, Adamawa Region, Cameroon. 12,000 CAR refugees building a community-owned fish farm to replace dependence on shrinking WFP food rations.

£43K
Total Budget
£92K
Projected Annual Revenue
10
Fish Ponds
167%
3-Year ROI
Community farming at Lolo Planting at the Lolo site Team surveying the farm site through dense vegetation
Team and community members during the first field assessment trip, April 2024. Lolo Camp, Cameroon.

Project Timeline

APR 2024
Phase 0 — Assessment & Design
First field trip. Site assessment, community consultation, soil testing, budget development. Partnership agreements with UDES and local authorities.
JUL–DEC 2024
Phase 1 — Infrastructure
10 earthen ponds excavated. Hatchery structure built. Solar panels installed. Land cleared and prepared. Community labour coordinated.
JAN–MAR 2025
Phase 1A — Water & Power
Borehole drilled to 70m. 5,000L elevated tank installed. Solar batteries replaced after tampering incident. Water infrastructure now operational.
APR–JUN 2025
Phase 2 — Stocking & First Cycle
Broodstock acquisition. Hatchery commissioning. First stocking of 5 ponds. Feed procurement and feeding protocol established.
OCT 2025
Phase 3 — First Harvest
6 months after stocking. First commercial harvest. Revenue generation begins. Market linkages activated.
2026
Phase 4 — Full Operations
All 10 ponds in rotation. 3 harvest cycles per year. Full self-sufficiency. Community management committee running operations independently.

Budget Transparency

Full budget breakdown. Updated after each phase.

ItemAmount
Land acquisition & preparation£4,200
Pond construction (10 ponds)£8,500
Hatchery construction£3,800
Borehole & water infrastructure£6,200
Solar power system£4,800
Broodstock & fingerlings£3,200
Feed (Year 1)£5,500
Equipment & tools£2,400
Training & capacity building£1,800
Project management & M&E£2,606
Total£43,006

What's next.

Field assessment for water well site
Planned
Solar Water Well — Lolo Extension

A second borehole serving the northern section of the camp. Solar-powered, gravity-fed distribution. Target: additional 10,000L/day for 4,000+ residents.

£5K
Target
4,000+
People
Girl writing Quran on wooden board at Lolo Camp
Planned — Phase 4
Lolo Community School

A permanent learning space funded by aquaculture revenue. Solar lighting, desks, trained teachers. Designed to outlast any single funding cycle.

200+
Students
Self
Funded
Boy showing his Quran wooden board
Planned
Quran Preservation Programme

Supporting the traditional alluha (wooden board) Quran schools with materials, lighting, and teacher training — preserving an ancient learning tradition.

3
Schools
100+
Children

Want to support a project?

Donations are processed by our registered charity partners. You receive full tax benefits and complete transparency on how your funds are used.

Support a Project Discuss Partnership