056c47581f
Ships the second dashboard surface — a Pattern Library + Preview Theatre — that presents the 4-section PDP pilot batch back to Umar, compliance, and the board in an editorial format. Adds the full data layer that drives it: 5 source-backed per-SKU drafts at QA 100/100, 15 competitor PDP semantic extracts, PubMed evidence packs, EFSA claims library extension, JV brand voice guide, hand-curated product FAQs, and the Matrixify-ready CSV exports for Lewis. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
33 lines
837 B
Markdown
33 lines
837 B
Markdown
# JV content population readiness audit
|
|
|
|
Generated: 2026-05-20T02:31:41.568Z
|
|
|
|
Overall ready: **NO**
|
|
|
|
## Summary
|
|
- Gates passing: 10/12
|
|
- Product records: 190
|
|
- Workflow records: 190
|
|
- Export blockers: 374
|
|
- Missing asset uploads/files: 0
|
|
- Source drop issues: 0
|
|
- Claims validation issues: 0
|
|
|
|
## Gates
|
|
- [PASS] catalogue_content_seeded
|
|
- [PASS] workflow_seeded
|
|
- [PASS] template_schema
|
|
- [BLOCKED] handoff_ready — Handoff manifest still has blockers.
|
|
- [PASS] asset_filenames_assigned
|
|
- [PASS] asset_uploads_ready
|
|
- [PASS] source_drops_ready
|
|
- [PASS] claims_library_ready
|
|
- [PASS] source_request_pack_ready
|
|
- [PASS] promo_cards_seeded
|
|
- [PASS] full_intelligence_coverage
|
|
- [BLOCKED] human_approval_complete — Approval lanes are not complete.
|
|
|
|
## Next actions
|
|
- Handoff manifest still has blockers.
|
|
- Approval lanes are not complete.
|